Supreme Court of India

BIHAR STATE ELECTRICITY BOARD & ANR vs DHANAWAT RICE AND OIL MILLS on 17 January, 1989

Cites 0 provisionsCites 2 judgmentsCited by 3
Official PDFBench Goverdhan Lal Oza, Madhukar Hiralal Kania
PETITIONER:
BIHAR STATE ELECTRICITY BOARD & ANR.
Vs.
RESPONDENT:
DHANAWAT RICE AND OIL MILLS
DATE OF JUDGMENT17/01/1989
BENCH:
OZA, G.L. (J)
BENCH:
OZA, G.L. (J)
SAIKIA, K.N. (J)
CITATION:
1989 AIR 1030 1989 SCR (1) 168
1989 SCC (1) 452 JT 1989 (1) 425
1989 SCALE (1)162
ACT:
Electricity (Supply) Act, 1948: Sections 18, 26, 28, 29,
49, 54 & 60--Agreement to supply electrical energy--Clauses
1, 4 and 13 of the agreement--Provision for constant supply
of electricity--Constant supply whether continuous
supply--Minimum annual guarantee payment-Tripping, load-
shedding and power cut--Failure to supply continuous elec-
tricity--Circumstances beyond control of Electricity
Board--Consequent non-consumption by consumer upto the level
of minimum guarantee--Consumer entitled to proportionate
reduction.
HEADNOTE:
Clause 1, of the agreement arrived at between the con-
sumerrespondents and the appellant-Electricity Board, pro-
vided for constant supply of electrical energy to the con-
sumers. Clause 4 provided that even if the consumer does not
consume electricity above the minimum guarantee then it will
be incumbent upon the consumer to pay annual minimum
energy at the pressure of ......
Volts, 50 cycles, 3 phases, 3 wires, alternat-
ing current system subject to standard varia-
tions as provided in Indian Electricity
Rules, 1956 or any other statutory modifica-
tion thereof as may be in force from time to
time for the purpose and upto the maximum
specified (hereinafter referred to as the
contract demand) and under the conditions laid
down in the Schedule."
This clause talks of constant supply of electrical energy
providing for voltage, cycles, phases and wires. It is clear
that it does not talk of continuous supply nor does it talk
of non-continuous or intermittent supply. In fact this
clause in our opinion is not very material for the decision
of the case as the sole controversy pertains to interpreta-
tion of clause 13.
Clause 4 of the agreement provides for the minimum
guarantee and there is no dispute that if the consumer is
not able to utilise electricity even upto the level of
minimum guarantee. This clause provides for payment of
charges of minimum guarantee. The real controversy pertains
to the interpretation of clause 13. In fact in Northern
India Iron & Steel Co. case. [1976] 2 SCR 677 this Court had
the occasion to consider a situation of this kind where this
Court on this aspect of the matter has observed that where
the Electricity Board fails to supply power because of
shortage of energy, power cut or any other circumstances as
per demand of the consumer according to the contract it will
be considered as a circumstance beyond the control of the
consumer which prevented it from consuming electricity as
per the contract.
Their Lordships observed as under:
"We are, therefore, of the view that
the inability of the Board to supply electric
energy due to power cut or any other circum-
stance beyond its control as per the demand of
the consumer according to the contract will be
reflected in and considered as a circumstance
beyond the control of the consumer which
prevented it from consuming electricity as per
the contract and to the extent it wanted to
consume. The monthly demand charge for a
particular month will have to be assessed in
accordance with subclause (b) of clause 4 of
the tariff and therefore from a proportionate
reduction will have to be made as per sub-
clause (f). We hope, in the light of the
judgment, there will be no difficulty in
working out the figures of the proportionate
reduction in any of the cases and for any
period. In case of any difference or dispute
as to the quantum of the demand charge or the
proportionate reduction, parties will be at
liberty to pursue their remedy as may be
available to them in accordance with law."
It appears that reading clause 13 in the present case clear-
ly provides for the contingency and it provides for the
failure on the part of the supplier and also failure on the
part of consumer in the circumstances like strike, riot,
fire, flood, explosion or act of God or any other reason
beyond the control of either of the parties. Clause 13 of
the agreement reads:
"If at any time the consumer is prevented from
receiving or using the electrical energy to be
supplied under this agreement either in whole,
or in part due to strikes, riots, fire,
floods, explosions, act of God or any other
case reasonably beyond control or if the Board
is prevented from supplying or unable to
supply such electrical energy owing to any or
all of the causes mentioned above then the
demand charge and guaranteed energy charge set
out in the schedule shall be reduced in pro-
portion to the ability of the consumer to take
or the Board to supply such power and the
decision of the Chief Engineer, Bihar State
Electricity Board, in this respect shall be
final."
In view of this language of the clause clearly providing for
the proportionate reduction of the annual minimum guarantee
bills it could not be doubted that the High Court was not
right in coming to the conclusion that the respondents were
not liable to pay annual minimum
guarantee bills at all. The judgment of this Court also
clearly indicated that the respondents consumers. are enti-
tled to a proportionate reduction of the minimum guarantee
bills. In clause 13 of the agreement this is clearly stated
that the authority competent to determine the proportionate
reduction is the Chief Engineer and it appears that it was
because of this that the respondents consumers approached
the Chief Engineer for consideration. But it appears that
the learned Chief Engineer also did not clearly understand
the meaning of clause 13. The judgment of the High Court on
which reliance is placed have only followed the judgment
referred to above.
In our opinion, therefore, the High Court was not right
in coming to the conclusion that the respondents were not
liable at all to pay annual minimum guarantee charges. In
fact they are only entitled to the proportionate reduction.
The judgment of the High Court clearly states the hours
every year in dispute when the power was not supplied and on
this basis the respondents consumers will be entitled to
proportionate reduction as ordinarily the consumers are
expected to have continuous power supply. It is therefore
directed that the Chief Engineer of the Electricity Board on
the basis of hours of non supply as indicated in the High
Court judgment and not disputed in the High Court will
assess the proportionate reduction of the annual minimum
guarantee bills in respect of disputed years indicated above
and it is also directed that until this is not done the
power supply will not be disconnected on the basis of fail-
ure to pay the annual minimum guarantee bills for the peri-
ods stated above. However,-after the proportionate reduction
is made and fresh demand is made, Electricity Board will be
entitled to take recourse to the normal procedure if the
consumers fail to pay.
In the circumstances no order as to costs.
T.N.A. Appeals allowed.

4. The Chief Engineer of the Electricity Board shall accordingly assess the proportionate reduction of the annual minimum guarantee bills in respect of disputed years on the basis of non supply as indicated in the High Court Judgment. [175D-E]

4.1. Pending assessment, the power supply of the consumers will not be disconnected on the ground of failure to pay the annual minimum guarantee bills. [175E]

4.2. The Electricity Board will be entitled to take recourse to the normal procedure if the consumers fail to pay after the proportionate reduction is made and fresh demand is made. [175E-F]

Amalgamated Electricity Co. Ltd. v. Jalagaon Borough Municipality, [1976] 1 SCR 636; M/s. Man Industrial Corporation v. Rajasthan State Electricity Board and others, AIR 1986 Rajasthan 137 and Mukand Iron and Steel Works Ltd. v. Maharashtra State Electricity Board and another, AIR 1982 Bombay 580, referred to.

CIVIL APPELLATE JURISDICTION: Civil Appeal Nos. 156164 of 1989.

From the Judgment and Order dated 24.7.1987 and 7.4.1988 of the Patna High Court in C.W.J.C. Nos. 253, 266, 262,255,260 265, 555,254 of 1986 and C.W.J.C. No. 17 of 1988 respectively. Dr. Y.S. Chitale and Pramod Swarup for the Appellants. N.R. Choudhary and L.R. Singh for the Respondents. The Judgment of the Court was delivered by OZA, J. Leave granted.

These special leave petitions have been filed against the judgment of the High Court of Patna by which several writ petitions were disposed of. All these special leave petitions have been preferred in this Court aggrieved by that judgment. The common question which arises in all these SLPs is that under the agreement arrived at between the consumers and the Bihar State Electricity Board there is a clause Of payment of minimum guarantee which indicates that even if the consumer does not consume electricity above the minimum guarantee that it will be incumbent upon the consumer to pay charges for energy which is the annual minimum guarantee provided in the agreement pertaining to Industrial units.

The relevant facts are that for the years 1973-74 to 1982-83 the bills for annual minimum guarantee were served on the appellants by the Electricity Supply Division, Forbesganj and on receipt thereto the appellants filed their claims as provided under clause 13 of the agreement on the ground that appellant was not liable to pay any such charges because the appellant did not supply constant electricity as provided in the agreement during the period in question and there were tripping, load shedding, and power-cut which resulted in a great loss to the petitioners and as the supply was not in accordance with the agreement liability to pay annual minimum guarantee bills could not be fastened on the consumer. The Chief Engineer who was the authority under the agreement negatived the claim and so they filed writ petitions in the High Court.

The High Court by the impugned judgment came to the conclusion that under clause 1 of the agreement it was incumbent for the Electricity Board to supply constant electricity and the consumer will be liable to pay annual minimum guarantee charges only if in spite of the fact that the Board supplies power as contemplated in the agreement and the consumer does not utilise the power then the liability to pay annual minimum guarantee charges will arise and on this basis the High Court quashed the demands made for these years on the basis of annual minimum guarantee as it found that power was not supplied according to the agreement.

Learned counsel appearing for the Electricity Board contended that clause 1 of the agreement does not in any manner mean that there should be a continuous supply. The term used in clause 1 of the agreement only talks of constant supply of electrical energy at the pressure of volts, cycles, 3 phase, 3 wire etc. but it does not talk of continuous supply without any break and it therefore could not be contended that if there was no supply for a few minutes it will amount to failure on the part of the Electricity Board to provide constant supply. It was contended that the constant supply cannot mean continuous supply. It was also contended that clause 4 of the agreement clearly talks of the payment of annual minimum guarantee charges and therefore it could not be said that because of the power cut or situations beyond the control of the Electricity Board if the power could not be supplied for all the 24 hours every day the respondent consumer can deny the liability to pay annual minimum guarantee bills. It was also contended that in view of clause 13 of the agreement which provides that if there was shortage of supply and that shortage resulted in short supply then the consumer was entitled to a proportionate reduction of the annual minimum guarantee bill as determined by the Chief Engineer, Bihar State Electricity Board and consequently the respondent in this case went to the Chief Engineer who ultimately decided on the basis of facts that respondents were not entitled to any proportionate reduction and it was because of this that the petitions were filed before the High Court. It was contended that the learned Judges of the High Court have failed to appreciate clause 13 of the agreement. Learned counsel also placed reliance on the decisions in Amalgamated Electricity Co. Ltd. v. Jalgaon Borough Municipality, [1976] 1 SCR 636; M/s Northern India Iron & Steel Co. etc. v. State of Haryana & Anr., [1976] 2 SCR 677; M/s Man Industrial Corporation v. Rajasthan State Electricity Board and others, AIR 1986 Rajasthan 137 and Mukand Iron and Steel Works Ltd. v. Maharashtra State Electricity Board and another, AIR 1982 Bombay 580.

Learned counsel for the respondents on the other hand contended that clause 1 provides for constant supply of power, the variations permitted have been indicated in this clause itself and it is contended that it is only where the electricity Board discharges its duty to supply power as contemplated in clause 1 and the consumer because of his difficulties is not able to utilise power even upto the level of minimum guarantee that the liability to pay annual minimum guarantee bills could be fastened on the consumer but if the Board fails to discharge its responsibilities as contemplated in clause 1 of the agreement it could not compel the consumer to pay the annual minimum guarantee. It was frankly conceded that in the petition itself originally relief sought was proportionate reduction of the annual minimum guarantee bills but in view of the interpretation of clauses 1, 4 and 13 the High Court came to the conclusion that there is no liability on the consumer to pay annual minimum guarantee bills as the Electricity Board has failed to supply power as contemplated in clause 1 of the agreement. Learned counsel however contended that the Chief Engineer in his order has misunderstood the whole situation but before the High Court the facts were not disputed and in each case average hours of supply per year during the disputed period have been stated which have not been disputed by the Electricity Board and if at all the High Court judgment is not maintained the respondents are entitled to proportionate reduction of the annual minimum guarantee bills in the light of the hours of supply per year which have been stated in the High Court judgment and is not disputed.

Clause 1 of the agreement reads as under:

"1. (a) The Board shall furnish to the consum-

er and the consumer shall accept at the point

of supply mentioned in the schedule hereto, on

and from the date on which the said premises

shall be connected with the supply Distribut-

ing mains and during the continuance of the

agreement, a constant supply of electrical

energy at the pressure of ......

Volts, 50 cycles, 3 phases, 3 wires, alternat-

ing current system subject to standard varia-

tions as provided in Indian Electricity

Rules, 1956 or any other statutory modifica-

tion thereof as may be in force from time to

time for the purpose and upto the maximum

specified (hereinafter referred to as the

contract demand) and under the conditions laid

down in the Schedule." This clause talks of constant supply of electrical energy providing for voltage, cycles, phases and wires. It is clear that it does not talk of continuous supply nor does it talk of non-continuous or intermittent supply. In fact this clause in our opinion is not very material for the decision of the case as the sole controversy pertains to interpretation of clause 13.

Clause 4 of the agreement provides for the minimum guarantee and there is no dispute that if the consumer is not able to utilise electricity even upto the level of minimum guarantee. This clause provides for payment of charges of minimum guarantee. The real controversy pertains to the interpretation of clause 13. In fact in Northern India Iron & Steel Co. case. [1976] 2 SCR 677 this Court had the occasion to consider a situation of this kind where this Court on this aspect of the matter has observed that where the Electricity Board fails to supply power because of shortage of energy, power cut or any other circumstances as per demand of the consumer according to the contract it will be considered as a circumstance beyond the control of the consumer which prevented it from consuming electricity as per the contract. Their Lordships observed as under:

"We are, therefore, of the view that

the inability of the Board to supply electric

energy due to power cut or any other circum-

stance beyond its control as per the demand of

the consumer according to the contract will be

reflected in and considered as a circumstance

beyond the control of the consumer which

prevented it from consuming electricity as per

the contract and to the extent it wanted to

consume. The monthly demand charge for a

particular month will have to be assessed in

accordance with subclause (b) of clause 4 of

the tariff and therefore from a proportionate

reduction will have to be made as per sub-

clause (f). We hope, in the light of the

judgment, there will be no difficulty in

working out the figures of the proportionate

reduction in any of the cases and for any

period. In case of any difference or dispute

as to the quantum of the demand charge or the

proportionate reduction, parties will be at

liberty to pursue their remedy as may be

available to them in accordance with law." It appears that reading clause 13 in the present case clearly provides for the contingency and it provides for the failure on the part of the supplier and also failure on the part of consumer in the circumstances like strike, riot, fire, flood, explosion or act of God or any other reason beyond the control of either of the parties. Clause 13 of the agreement reads:

"If at any time the consumer is prevented from

receiving or using the electrical energy to be

supplied under this agreement either in whole,

or in part due to strikes, riots, fire,

floods, explosions, act of God or any other

case reasonably beyond control or if the Board

is prevented from supplying or unable to

supply such electrical energy owing to any or

all of the causes mentioned above then the

demand charge and guaranteed energy charge set

out in the schedule shall be reduced in pro-

portion to the ability of the consumer to take

or the Board to supply such power and the

decision of the Chief Engineer, Bihar State

Electricity Board, in this respect shall be

final." In view of this language of the clause clearly providing for the proportionate reduction of the annual minimum guarantee bills it could not be doubted that the High Court was not right in coming to the conclusion that the respondents were not liable to pay annual minimum guarantee bills at all. The judgment of this Court also clearly indicated that the respondents consumers. are entitled to a proportionate reduction of the minimum guarantee bills. In clause 13 of the agreement this is clearly stated that the authority competent to determine the proportionate reduction is the Chief Engineer and it appears that it was because of this that the respondents consumers approached the Chief Engineer for consideration. But it appears that the learned Chief Engineer also did not clearly understand the meaning of clause 13. The judgment of the High Court on which reliance is placed have only followed the judgment referred to above.

In our opinion, therefore, the High Court was not right in coming to the conclusion that the respondents were not liable at all to pay annual minimum guarantee charges. In fact they are only entitled to the proportionate reduction. The judgment of the High Court clearly states the hours every year in dispute when the power was not supplied and on this basis the respondents consumers will be entitled to proportionate reduction as ordinarily the consumers are expected to have continuous power supply. It is therefore directed that the Chief Engineer of the Electricity Board on the basis of hours of non supply as indicated in the High Court judgment and not disputed in the High Court will assess the proportionate reduction of the annual minimum guarantee bills in respect of disputed years indicated above and it is also directed that until this is not done the power supply will not be disconnected on the basis of failure to pay the annual minimum guarantee bills for the periods stated above. However,-after the proportionate reduction is made and fresh demand is made, Electricity Board will be entitled to take recourse to the normal procedure if the consumers fail to pay. In the circumstances no order as to costs. T.N.A. Appeals allowed.