LawDistill
Supreme Court of India

RELIANCE INFRASTRUCTURE LIMITED vs STATE OF MAHARASHTRA on 21 January, 2019

Cites 3 provisionsCites 0 judgmentsCited by 7
2019 INSC 63C.A. No.-000879-000879 - 2019Official PDFAuthor HON'BLE THE CHIEF JUSTICEBench Deepak Gupta, Hemant GuptaAdvocates RAJESH KUMAR
REPORTABLE
IN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION
CIVIL APPEAL NO 879 OF 2019
(@ SPECIAL LEAVE PETITION (C) NO 15754 OF 2016)
RELIANCE INFRASTRUCTURE LIMITEDAPPELLANT
VERSUS
STATE OF MAHARASHTRA AND ORS.RESPONDENTS
J U D G M E N T

Dr Dhananjaya Y Chandrachud, J

1 Leave granted.

2 The validity of a tariff regulation framed by the Maharashtra Electricity

Regulatory Commission (MERC) was questioned before the High Court of

Judicature at Bombay. Bereft of jargon – both legal and scientific – the plea of

the appellant is of discrimination. The discrimination, according to the appellant,

lies in a statutory regulation determining the Station Heat Rate. According to

the appellant, its thermal power station at Dahanu has been subjected to a more

Digitally signed by norm than other comparable units. MERC, it is asserted, breachedSANJAY KUMARstringent

the National Tariff Policy 2006. The High Court held against the appellant both

on the maintainability of its writ petition under Article 226 of the Constitution and

on the merits of the challenge to the validity of the statutory regulation. The case

has thus travelled to this Court.

3 The Electricity Act 2003 came into force on 10 June 2003. Electricity

Regulatory Commissions constituted under Section 82 are empowered to frame

regulations under Section 181, including the terms and conditions for

determination of tariff under Section 611. The MERC framed the MERC (Terms

and Conditions of Tariff) Regulations 20052 for a period of five years, upto

financial year 2010-11. The regulations, in so far as the appellant is concerned

were extended for a further period of one year upto financial year 2011-12.

4 Regulation 33.1.3 prescribed the Station Heat Rate (SHR). The SHR is the

heat energy required to generate one unit of electrical energy. The SHR is

significant because it represents the ratio between heat input and the energy

output. SHR has a co-relationship with efficiency: a higher SHR reflects

comparative inefficiency while a reduction in the SHR is associated with increasing

levels of efficiency. In the Tariff Regulations 2005, the gross SHR was defined in

the following terms:

“33.1.3. Gross station heat rate

(a) Gross station heat rate for coal-based generating stations

200/210/250 MW sets 500 MW and above sets

During stabilization 2600 kCal/kWh 2550 kCal/kWh

Period

Subsequent period 2500 kCal/kWh 2450 kCal/kWh

Note 1:

1 Section 181(2)(zd)

In respect of 500 MW and above units where the boiler feed pumps are electrically

operated, the gross station heat rate shall be 40 kCal/kWh lower than the station heat

rate indicated above.

Note 2:

For generating stations having combination of 200/210/250 MW seats and 500 MW and

above sets, the normative gross station heat rate shall be the weighted average station

heat rate.”

In the above regulations, uniform norms were fixed for all coal based thermal

generating stations, without any distinction between individual generating stations.

The norm applicable to the Dahanu Thermal Power Station of the appellant was

2500 kCal/kWh. This norm also applied to other generating stations in the State

of Maharashtra.

5 On 6 January 2006 the Union of India in the Ministry of Power notified the

National Tariff Policy under Section 3 of the Electricity Act 2003. The policy, inter

alia, spelt out the general approach to be followed for the purpose of determining

tariffs including operating norms for generating stations. Clause 4 of the policy laid

out its objectives in the following terms:

“(a) Ensure availability of electricity to consumers at

reasonable and competitive rates;

(b) Ensure financial viability of the sector and attract

investments;

(c) Promote transparency, consistency and predictability in

regulatory approaches across jurisdictions and minimise

perceptions of regulatory risks;

(d) Promote competition, efficiency in operation and

improvement in quality of supply.”

Clause 5.0 spells out the “general approach to tariff”. Clause 5(f) stipulates

operating norms:

“(f) Operating Norms

Suitable performance norms of operations together with

incentives and dis-incentives would need be evolved along

with appropriate arrangement for sharing the gains of efficient

operations with the consumers. Except for the cases referred

to in para 5.3 (h) (2), the operating parameters in tariffs should

be at “normative levels” only and not at “lower of normative and

actuals”. This is essential to encourage better operating

performance. The norms should be efficient, relatable to past

performance, capable of achievement and progressively

reflecting increased efficiencies and may also take into

consideration the latest technological advancements, fuel,

vintage of equipments, nature of operations, level of service to

be provided to consumers etc. Continued and proven

inefficiency must be controlled and penalized. The Central

Commission would, in consultation with the Central Electricity

Authority, notify operating norms from time to time for

generation and transmission. The SERC would adopt these

norms. In case where operations have been much below the

norms for many previous years, the SERCs may fix relaxed

norms suitably and draw a transition path over the time for

achieving the norms notified by the Central Commission.

Operating norms for distribution networks would be notified by

the concerned SERCs. For uniformity of approach in

determining such norms for distribution, the Forum of

Regulators should evolve the approach including the

guidelines for treatment of state specific distinctive features.”

Clause 5 (h) adverts to the Multi Year Tariff:

“(h) Multi Year Tariff

(1) Section 61 of the Act states that the Appropriate

Commission, for determining the terms and conditions for

the determination of tariff, shall be guided inter-alia, by

multi-year tariff principles. The MYT framework is to be

adopted for any tariffs to be determined from April 1, 2006.

The framework should feature a five-year control period.

The initial control period may however be of 3 year duration

for transmission and distribution if deemed necessary by

the Regulatory Commission on account of data

uncertainties and other practical considerations. In cases

of lack of reliable data, the Appropriate Commission may

state assumptions in MYT for first control period and a

fresh control period may be started as and when more

reliable data becomes available.

(2) In cases where operations have been much below the

norms for many previous years, the initial starting point in

determining the revenue requirement and the improvement

trajectories should be recognised at “relaxed” levels and

not the “desired” levels. Suitable benchmarking studies

may be conducted to establish the “desired” performance

standards. Separate studies may be required for each

utility to assess the capital expenditure necessary to meet

the minimum service standards…”

6 In August 2009, MERC published a ‘draft approach paper’ for the purpose

of enacting multi year tariff regulations for financial years 2010-11 to 2014-15. On

23 October 2009, the appellant furnished its suggestions. In 2010, MERC

commissioned a report from the Central Power Research Institute (CPRI) for

ascertaining achievable performance parameters for thermal power plants in

Maharashtra and to suggest improvements. CPRI carried out an independent

assessment in respect of the plant of the appellant (DTPS), Tata Power

(Generation) – TPCG, and Maharashtra State Power Generation Company Limited

(MSPGCL). According to the appellant, no recommendation was made in respect

of their plant since it was performing better than the prescribed SHR.

7 In July 2010, MERC published another draft approach paper in regard to the

proposed multi year tariff regulations for financial years 2011-12 to 2015-16

together with draft regulations. On 26 October 2010, the appellant made

submissions on the draft approach paper. On 4 February 2011, the MERC (Multi

Year Tariff) Regulations, 20113 were notified. Regulation 2(32) defines the Gross

Station Heat Rate thus:

“(32) “Gross Station Heat Rate” means the heat energy input

in kcal required to generate one kWh of electrical energy at

generator terminals.”

Regulation 44 provides norms for the operation of thermal generating stations.

Regulation 44.2 stipulates gross station heat rates for existing generating stations

in the following terms:

“44.2 Gross Station Heat Rate - For existing Generating

Stations:

a) Existing Coal-based Thermal Generating Stations, other than

those covered under clauses (b), (c) and (d), below:

200/210/250 MW sets 500 MW and above sets

2450 kcal/kWh 2425 kcal/kWh

Note 1

In respect of 500 MW and above Units, where the boiler feed

pumps are electrically operated, the gross Station Heat Rate shall

be 40 kcal/kWh lower than the gross Station Heat Rate indicated

above.

Note 2

For Generating Stations having combination of 200/210/250 MW

sets and 500 MW and above sets, the normative gross Station

Heat Rate shall be the weighted average station heat rate.

b) Thermal Generating Stations of Maharashtra State Power

Generation Company Ltd. (MSPGCL):

Year Koradi Khaperkheda Chandrapur Nasik Bhusawal Paras Parli

excluding excluding

Unit No.3 Unit No.6

Provided that the Commission may revise the norms for heat rate

for the above mentioned Generating Stations in case of

Renovation & Modernisation undertaken for the Generating

Station.

c) Thermal Generating Units of the Tata Power Company Ltd.

Generation Business (TPC-G):

Year Unit-4 Unit-5 Unit-6

With Oil & Gas

mix.in

proportion of

50:50*

* In case variation in Oil and Gas mix is more than +/- 5%, the

Heat Rate for Unit 6 shall be approved considering the actual Oil

and Gas Mix.

d) Thermal Generating Station of Reliance Infrastructure Ltd.-

Generation Business (RInfra-G):

Year Dahanu TPS

FY 2011-12 2350

FY 2012-13 2355

FY 2013-14 2360

FY 2014-15 2365

FY 2015-16 2370

8 The above regulation indicates that save and except for the excluded

categories set out in clauses (b), (c) and (d), the SHR for existing coal based

thermal generating stations is pegged at a uniform level of 2450 kCal/kWh (for

200/210/250 MW sets) and 2425 kCal/kWh (for 500 MW sets and above). The

excluded categories are the generating stations of (i) MSPGCL; (ii) TPC – G; and

(iii) RInfra-G. As the table in clause (b) of Regulation 44.2 indicates, a relaxed

standard for the SHR has been prescribed for the units of MSPGCL. However,

there is an exclusion within the exclusion for Unit 3 at Paras and Unit 6 at Parli,

since these units are governed by the uniform criterion prescribed in clause (a).

The dispensation for Units 4, 5 and 6 of TPC-G is prescribed in clause (c). For Unit

8 of TPC-G, the applicable SHR is in terms of the uniform rate of 2450 kCal/kWh,

since this unit is not specified in clause (c).

9 The grievance of the appellant arises from the fact that a tighter standard or

norm has been prescribed for its Dahanu TPS. As opposed to the uniform criterion

of 2450 kCal/kWh in Regulation 44.2(a), the SHR for the Dahanu TPS varies

between 2350 in financial year 2011-12 to 2370 in financial year 2015-16.

Essentially, it is this prescription of a more stringent SHR in the case of R-Infra’s

Dahanu TPS which forms the focus of dispute in the present case.

10 In order to buttress its grievance of discrimination, the appellant has relied

upon the Multi Year Tariff regulations notified by MERC for the previous period

(2005-10) and for the subsequent period (2016-21). The MERC (Multi Year Tariff)

Regulations 20154 which govern the period 1 April 2016 to 31 March 2020 place

the Dahanu TPS of RInfra-G at par with other coal-based thermal generating

stations. Regulation 44.4 is in the following terms:

“44.4 Gross Station Heat Rate for existing coal-based thermal

Generating Stations, other than those covered under Regulation

44.5 and 44.6 shall be:

200/210/250 MW 300 MW sets 500 MW sets (sub-

sets critical boilers)

2450 kcal/kWh 2400 kcal/kWh 2375 kcal/kWh

Note 1

In respect of 500 MW Units, where the boiler feed pumps are

electrically operated, the Gross Station Heat Rate shall be 40

kcal/kWh lower than the gross Station Heat Rate specified above.

Note 2

For Generating Stations having combination of 200/210/250 MW

sets and 300 MW and 500 MW sets, the normative gross Station

Heat Rate shall be weighted average Station Heat Rate.”

Regulation 44.5 contains the SHR for the coal based thermal generating stations

of MSPGCL. Regulation 44.6 specifies the SHR for TPC-G. Regulations 44.5 and

44.6 are extracted below:

“44.5 Gross Station Heat Rate for existing coal-based thermal

Generating Stations of Maharashtra State Power Generation

Company Ltd. (MSPGCL) shall be:

Year Koradi Khaperkheda Chandrapur Nashik Bhusawal Parli

Provided that the Commission may revise the Gross Station Heat

Rate norms for these Generating Stations in case any Renovation

& Modernization is undertaken.

44.6 Gross Station Heat Rate for existing thermal Generating

Stations of The Tata Power Company Ltd- Generation Business

(TPC-G) shall be:

Year Unit-5 Unit- 6

With 100 % Gas With 100 % Oil With Oil &

firing firing Gas mix in

proportion

of 50:50*

*In case variation in Oil and Gas mix is more than +/- 5%, the

Gross Station Heat Rate for Unit 6 shall be approved considering

the actual Oil and Gas Mix.”

In Regulation 44.5, Units 4 and 5 at Bhusawal and Units 6 and 7 at Parli have been

excluded. Similarly, Unit 8 for TPC-G is excluded from the SHR in Regulation 44.6.

11 In order to complete the narration, it may be noted that on 2 September

2011, MERC passed an order on a petition filed by the appellant for deferring the

implementation of the MYT regulations. On 5 May 2012, the appellant submitted a

petition for approval of its business plan for financial years 2010-11 to 2015-16.

The appellant requested that the norm should be relaxed and brought in line with

the normative SHR. On 25 October 2012, MERC passed an order on the MYT

Business Plan for RInfra-G stating that it had considered the norms for SHR based

on the MYT regulations. MERC held thus:

“Station heat rate

4.5.2

RInfra-G submitted that MYT Regulations, 2011 framed the

norms for DTPS based on the plant’s historical performance.

RInfra-G submitted that it believes that all operating

parameters, “norms” including the secondary oil consumption,

auxiliary energy consumption, station heat rate and transit loss

should be specified to create a level playing field and bring

discipline for regulated entities for the benefit of beneficiaries

of the state. RInfra-G submitted that the essence of the norms

should be to create benchmarks based on industry-wide

performance and let the market to reward or penalize the

performance of the utilities vis-à-vis those benchmarks. RInfra-

G further submitted that such mechanism will not only force

underperforming utilities to perform but also bring the

competitive price of power in the market in overall benefit of

consumers.

4.5.3

In its Petition under Case No.45 of 2011, RInfra-G had raised

the issue of specifying separate norms for SHR of DTPS in the

MYT Regulations, 2011 and argued that any norm for

generating stations should be made based on performance of

the industry as a whole and should not be specific to a plant

based on its historical performance.

4.5.4

RInfra-G submitted that specific relaxations from the norms

can, however, be provided considering the specific issues of

any given plant. In the said Petition, RInfra-G also highlighted

the SHR norms adopted by other Regulatory Commissions to

bring out its point that the SHR norms should be linked with

unit size and ageing and not driven by the performance of the

generating company. RInfra-G further added that the tightening

of the norms for efficient generating plant is against the

principle of equality and rewarding efficiency.

4.5.5

Accordingly, RInfra-G has requested the Commission not to

tighten the norms for DTPS and retain it at industrial normative

level of 2450 kCal/kWh. RInfra-G submitted that the

Commission, in its Order in Case No.45 of 2011 dated 2

September, 2011 on the said Petition did not provide any

specific ruling on the said contention of RInfra-G; however

stated that the Commission could invoke its powers alter the

MYT norms for SHR and OEM cost, if required.

4.5.6

The Commission is of the view that norms can be fixed station

wise based on the historical performance of the plant. The SHR

of the plant is dependent on the age of the plant, the technology

used, the capital expenditure incurred overhauling the plant,

regular repair and maintenance expenditure incurred and

various other factors. Hence, there could be wide variations on

SHR across plants. Further, if the Commission derives the

benchmark considering only the industry-wide performance

capital and operating expenditures incurred, the generating

company may not have sufficient motivation to continue to

operate as efficiently as it had been in the past. Therefore, a

balanced approach is to provide a target which will adequately

motivate the generating plant to perform at existing levels or

better and still have room for earning incentives. Moreover, the

MYT Regulations, 2011 have been finalised after following

appropriate regulatory process after considering and

deliberating on the views of all stakeholders on various issue.

Considering all the facts discussed above, the Commission

does not find any merit in altering the MYT norms for SHR.

Therefore, though RInfra-G has proposed a SHR of 2,450

kCal/kWh, the Commission has considered the SHR as per the

MYT Regulations, 2011.

4.5.7

For FY 2011-12, the Commission has considered the SHR as

approved in the ARR Order in Case No.163 of 2011. The SHR

approved by the Commission for RInfra-G for the second

control period is as below:

Table 5: Approved station heat rate for the second control

period

Station heat FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY

rate 2015-16

(kCal/kWh) As submitted 2500 2450 2450 2450 2450 by RIfra-G

As approved by 2500 2355 2360 2365 2370

the

Commission

12 On 7 December 2012, the appellant filed an appeal under Section 111 of

the Electricity Act 2003 before the Appellate Tribunal for Electricity (APTEL)

against the order dated 25 October 2012. The appellant submitted that the MERC

ought to have exercised its power under Regulations 99 and 100 of the Tariff

Regulations 2011 to amend and remove difficulties since the SHR which was

prescribed for Dahanu TPS was not the same as for similarly situated generating

units.

13 On 3 October 2013, the appellant instituted a writ petition under Article 226

of the Constitution before the Bombay High Court for the purpose of challenging

Regulation 44.2(d) which specifies a separate SHR for the Dahanu TPS as

compared to other generating stations in the State of Maharashtra. The appellant

disclosed the pendency of the appeal before the Tribunal against MERC’s order

dated 25 October 2012 disallowing the prayer for relaxing the norms.

14 MERC opposed the writ petition. MERC submitted that the appellant had

filed a substantive petition seeking approval of its business plan for the financial

years 2010-11 to 2015-16 and an SHR of 2450 kCal/kWh for 2012-13 to 2015-16.

MERC in the course of its adjudication on the business plan had adopted the same

SHR as under the tariff regulations. MERC contended that since the appeal before

the Tribunal was pending, the appellant was not entitled to pursue a remedy under

Article 226 of the Constitution.

15 The Appellate Tribunal for Electricity disposed of the appeal on 8 April 2015,

recording that it did not survive in view of the institution of the writ proceedings

before the Bombay High Court. The appellant asserts that it drew the attention of

the High Court, when the writ petition was being heard, to the fact that the appeal

before the Tribunal was not pending and had been disposed of.

16 The High Court by its judgment dated 18 April 2016 dismissed the writ

petition. In coming to the conclusion that the petition was lacking in merit, the High

Court came to the following conclusions:

(i) MERC in framing statutory regulations in exercise of the power conferred by

Section 181 had followed the procedure by granting an opportunity to stake holders

including the appellant to make their suggestions on the draft approach paper

which was published on the basis of the CPRI report;

(ii) CPRI was commissioned to undertake a study in order to fix norms for SHR

for different power stations in the State of Maharashtra and it was only after the

technical material collated by CPRI was considered and reviewed that the tariff

regulations were notified prescribing SHR norms for various power stations;

(iii) MERC has applied the principles evolved in the tariff policy which stipulates

that the operating norms should be “efficient, relatable to past performance,

capable of achievement and progressively reflect increased efficiencies”. The past

performance of the Dahanu TPS of the appellant was also taken into consideration;

(iv) The submissions urged by the appellant was not accepted for two reasons

which were formulated by the High Court as follows:

“Firstly, if this submission is accepted then the whole exercise

of undertaking an expert analysis, the working of each of the

thermal power station to determine the SHR by studying

various factors including the past performance would be

rendered nugatory. Secondly the tariff standards are required

to be fixed on realistic data and its consideration, as public

interest is directly involved in fixation of the electricity tariff. The

contention of the petitioner if accepted it would also result in a

situation that the realistic standards are deviated to fix

unrealistic or a camouflage norms. This is surely not

permissible and is fundamentally against public interest being

against the interest of the consumers of electricity. The

submission of the petitioner is only from the sole consideration

of profits of the petitioner, while disregarding the norms and

standards required to be followed by the 2nd Respondent in

determination of the electricity tariff.”

(v) In the exercise of its jurisdiction under Article 226 of the Constitution, the

High Court cannot decide on technical parameters or come to the conclusion that

the norms fixed by MERC are inappropriate;

(vi) The power to frame tariff regulations under Section 181 of the Electricity Act

2003 is of a legislative character. The regulations constitute subordinate

legislation. Once MERC has followed appropriate procedures mandated by the

Electricity Act, the Court will not interfere with the regulations merely on the ground

that the SHR prescribed for the power station of the appellant was fixed at a rate

below its peers;

(vii) Profitability of the producer is not the only consideration in determining the

SHR. The regulations are also framed in the interest of the consumers of electricity;

and

(viii) Having approached the Appellate Tribunal for Electricity, the appellant was

not justified in moving the High Court under Article 226 “on the same issue” when

the Tribunal was in a position to provide adequate relief. Entertaining a writ petition

of this nature, when an alternate remedy is provided by the statute would render

the statutory machinery under the Electricity Act nugatory. The petition under

Article 226 was held to be an abuse of process.

While dismissing the petition, the High Court imposed costs of Rs 1 lakh on the

appellant.

17 While assailing the decision of the High Court, Mr P Chidambaram, learned

Senior Counsel, urged that the High Court was not justified in coming to the

conclusion that in view of the pendency of the appeal before APTEL, recourse to

the jurisdiction under Article 226 constituted an abuse of process. Learned Senior

Counsel submits that the pendency of the appeal before APTEL was disclosed in

paragraph 27 of the writ petition before the High Court:

“27. As stated hereinabove, the Petitioners have preferred

Appeal No.4 of 2013 before the Appellate Tribunal for

Electricity challenging the Order dated 25th October 2012

insofar as Respondent No.1 disallows the Petitioners prayer

for relaxation of the norms under Regulations 99 and 100 of

the MYT Regulations. The present Petition challenges the

vires, legality and validity of Regulation 44.2 (d) of the MYT

Regulations that fixes SHR norms for the 1st Petitioners. Save

as aforesaid, the Petitioners have not filed any other Petition in

respect of the subject matter of the present Petition either

before this Hon’ble Court or any other High Court or the

Supreme Court of India.”

In response to the objection raised by MERC, the following assertion was

contained in the rejoinder filed by the appellant before the High Court:

“2.3. The Petitioners in the Petition have, inter alia, in

paragraph 27 thereof disclosed to this Hon’ble Court that they

have preferred Appeal No. 4 of 2013 before the Appellate

Tribunal for Electricity challenging the order dated 25th

October 2012 passed in Case No. 156 of 2011 which

disallowed the Petitioners’ prayer for relaxation of the norms

under Regulations 99 and 100 of the MYT Regulations. It is

settled law of the Hon’ble Supreme Court of India that the

Appellate Tribunal for Electricity has no power, authority or

jurisdiction to go into validity or legality of Regulations framed

by a Regulatory Commission. Regulation 44.2 (d) has been

challenged in the present Writ Petition and is not the subject

matter of any other Petition or Appeal in any other Court as

stated, inter alia, in paragraph 27 of the Petition. In fact, the

Petitioners have enclosed at Exhibit-K to the Petition a copy

of the Memorandum of Appeal without annexures. It is denied

that there is any forum shopping. The said Appeal has since

been heard by the Appellate Tribunal, in any event, was not

pressed by the Petitioners at the final hearing of the Appeal.

The grievance of Respondent No. 2, in any event, does not

survive.”

The submission of the appellant on the maintainability of the proceedings under

Article 226 is that the scope of the appeal before the Tribunal was entirely different

from the ambit of the writ petition. The appellant moved the Tribunal against the

order of MERC dated 25 October 2012 which disallowed the prayer for relaxation

of the norms under Regulations 99 and 100 of the Tariff Regulations 2011. The

petition challenged the vires of the regulations before the High Court and the

remedy before the High Court was the only remedy available to challenge the

validity of the regulations.

18 On the maintainability of the petition under Article 226, the High Court, in

our view, has overlooked the position in law established by the judgment of a

Constitution Bench of this Court in PTC India Limited v Central Electricity

Regulatory Commission5. The Constitution Bench considered whether the

Appellate Tribunal for Electricity has jurisdiction to decide upon the validity of the

regulations framed by the Central Electricity Regulatory Commission. CERC has

been entrusted with the power to frame regulations under Section 178 of the

Electricity Act 2003. The Constitution Bench held that the validity of a regulation

framed under Section 178 can be tested only before the court exercising judicial

review. While the Tribunal may decide upon a dispute involving the interpretation

of a regulation, for which an appeal under Section 111 would be maintainable, no

appeal can lie before the Tribunal on the validity of a regulation. The summary of

the findings in the judgment includes, inter alia, the following:

“(iii) A regulation under Section 178 is made under the

authority of delegated legislation and consequently its validity

can be tested only in judicial review proceedings before the

courts and not by way of appeal before the Appellate Tribunal

for Electricity under Section 111 of the said Act.

(iv) Section 121 of the 2003 Act does not confer the power of

judicial review on the Appellate Tribunal. The words “orders”,

“instructions” or “directions” in Section 121 do not confer the

power of judicial review in the Appellate Tribunal for Electricity.

In this judgment, we do not wish to analyse the English

authorities as we find from those authorities that in certain

cases in England the power of judicial review is expressly

conferred on the tribunals constituted under the Act. In the

present 2003 Act, the power of judicial review of the validity of

the regulations made under Section 178 is not conferred on the

Appellate Tribunal for Electricity.

(v) If a dispute arises in adjudication on interpretation of a

regulation made under Section 178, an appeal would certainly

lie before the Appellate Tribunal under Section 111, however,

no appeal to the Appellate Tribunal shall lie on the validity of a

regulation made under Section 178.”

Hence the conclusion of the Court is in the following terms:

“The Appellate Tribunal for Electricity has no jurisdiction to

decide the validity of the Regulations framed by the Central

Electricity Regulatory Commission under Section 178 of the

Electricity Act, 2003. The validity of the Regulations may,

however, be challenged by seeking judicial review under

Article 226 of the Constitution of India.”

Though the above principles emerge in the context of regulations framed under

Section 178 by the CERC, the logic of the judgment extends to the regulations

framed under Section 181 by the State Electricity Regulatory Commissions. In view

of the legal position settled by the Constitution Bench, we are of the clear view that

the High Court was not justified in disparaging the appellant for taking recourse to

a constitutional remedy under Article 226. Indeed, a challenge to the validity of the

regulations framed by the MERC could only lie before the High Court. Hence, the

imposition of costs for having adopted the remedy under Article 226 was

unjustified. There was no suppression of fact on the part of the appellant which

had indicated the recourse it had taken in the appeal before the Tribunal, arising

from its prayer for relaxation of the SHR norms before MERC. The plea before the

Appellate Tribunal was for relaxation of the SHR norms. The plea before the High

Court was that the SHR fixed was discriminatory and ultra vires. Undoubtedly, if

the appellant were to succeed before the Tribunal, it would perhaps obviate the

challenge in the High Court. The appellant, as learned Senior Counsel informed

the court, did not press ahead with its plea before the Tribunal. Hence, the writ

petition could not have been held not to be maintainable.

19 The High Court has dealt with the merits of the challenge to the validity of

the regulations. The constitutional validity of Regulation 44.2(d) of the Tariff

Regulations 2011 is the subject of the challenge in these proceedings. The basic

challenge which has been addressed before the Court is founded on a plea of

discrimination. Elaborating on this challenge, Mr P. Chidambaram, learned Senior

Counsel urged the following submissions:

(i) Regulation 44.2(d) is contrary to the national tariff policy. While framing

regulations under Section 181, MERC is required by Section 61(i) to be guided by

the “National Electricity Policy and tariff policy”. Clause 5.3(f) of the national tariff

policy notified on 6 January 2006 by the Union Ministry of Power requires that

operating parameters and tariffs should be at “normative levels” only and not at

“lower of normative and actuals”. Regulation 44.2(d) lays down a more stringent

SHR for the appellant, based on its energy efficient performance by disregarding

the normative levels;

(ii) The CPRI report, which was commissioned by MERC contains the following

conclusions on the comparability of RInfra’s Dahanu TPS with Paras Unit 3 and

Parli Unit 6 (of MSPGCL) and TPC-G Unit 8:

“ii. DTPS units are identical to units installed at Parli Unit 6,

Paras Unit 3 & Tata Trombay Unit 8. They are of the general

or standard design of 250 MW duplicated by BHEL in nearly 25

units in India.

iii. Both DTPS units have operating margins of 8% steam flow

in the boiler side (BMCR flow), 5% power output on the turbine

side (VWO flow) and 16% on the generator side (capability

curve) and 23% on the generator transformer side. These

margins are provided in all 250 BHEL supplied units, including

those at Paras Unit 3, Parli Unit 6 and Tata Trombay Unit 8 as

elaborated in the text.”

Moreover, the CPRI report observes that:

“vii. Combining all the margins provided by the OEM, R-Infra

has been able to load the unit to 268 MW against the design

value of 250 MW. Maintaining this load is not harming the life

of the unit as the DTPS has ensured that all parameters are

kept within OEM limits. High loadability is made possible by

high energy efficiency or low unit heart rate of the unit. When

the deviation of the unit heat rate from the design heart rate is

low, heat generation in the equipment is low which enables the

parameters not to exceed their limits. As many as 66 units in

India have clocked average annual plant loading in excess of

100% UMCR in 2007-08.”

R Infra’s Dahanu TPS unit has been found to be identical to Parli Unit 6, Paras unit

3 (MSPGCL) and Trombay unit 8 (of Tata power). The units have the same design,

standard and OEM. Therefore, merely because the appellant has performed

better, this would not be a ground to subject it to more stringent norms;

(iii) In any event, for the next control period – 2016-20, the appellant has been

equated with other thermal power stations. There exists no justifiable reason for

making a distinction for the period 2011-16 and for imposing more stringent norms

for SHR in the case of DTPS. In imposing more stringent norms on the appellant

for its DTPS unit for 2011-16, MERC has acted in an arbitrary exercise of power

which violates Article 14 of the Constitution; and

(iv) As a matter of fact, CPRI did not furnish a “trajectory” for the appellant’s

DTPS unit, as assumed by the High Court. A trajectory was furnished for less

efficient plants.

20 On the other hand, contesting the submissions which were urged on behalf

of the appellant, Mr SK Rungta, learned Senior Counsel for the respondents urged

the following submissions:

(i) The SHR represents heat energy required to generate one unit of electrical

energy. The norm determines the cost of coal and corresponding gas that will be

allowed to be recovered. Fixation of the SHR has an important bearing on the cost

of energy which will be recovered from the consumer;

(ii) There is a fundamental error in the submission that the CPRI report found

an equivalence between the appellant’s Dahanu TPS with Parli Unit 3 and Paras

Unit 6 (of MSPGCL) and Trombay Unit 8 (of Tata Power). CPRI found an

equivalence of specifications and not of performance. The dates on which the

above three units commenced operations were:

• Paras 3 31 March 2008;

• Parli 6 1 November 2007;

• TPC 8 31 March 2008.

The appellant’s unit at Dahanu commenced operations in 1995. CPRI has not, as

a matter of fact, come to the conclusion that the performance of DTPS was

equivalent to Parli Unit 6, Paras Unit 3 and Trombay Unit 8;

(iii) The CPRI report has separately evaluated DTPS and the units of Tata

Power and MSPGCL. It is factually incorrect to posit that the CPRI study was for

Parli Unit 6, Paras Unit 3 and Trombay Unit 8;

(iv) After the enactment of the Electricity Act 2003, the first MYT regulations

were promulgated in 2005. All units were placed at par in the absence of a base

line study at that stage;

(v) Section 61(i) requires that the appropriate commission “shall be guided by”

the principles set out in the tariff policy. The tariff policy enunciates the factors

which have to be taken into account while framing the tariff regulations;

(vi) In the MYT regulations which governed the period 2011-16, the sharing of

gains occasioned by the SHR, between the producer and the consumer, was in

the ratio of 2/3:1/3. In the 2015 regulations, the ratio of sharing has been altered

and 2/3rd enures to the benefit of the consumer; and

(vii) The SHR delivered by the appellant for 2006-07 to 2009-10 would

sufficiently explain the basis of fixation. The same principle has been applied in

the case of Tata power;

(viii) Unless a subordinate legislation is found to suffer from manifest

unreasonableness or from a breach of the principle of proportionality, it would not

be regarded as ultra vires.

21 These submissions fall for our consideration.

22 The power to determine tariffs is of a legislative nature. Section 61 is borne

in Part VII of the Electricity Act 2003 which deals with tariffs. Section 61 provides

thus:

“Section 61. Tariff regulations: The Appropriate Commission

shall, subject to the provisions of this Act, specify the terms and

conditions for the determination of tariff, and in doing so, shall

be guided by the following, namely:-

(a) the principles and methodologies specified by the Central

Commission for determination of the tariff applicable to

generating companies and transmission licensees;

(b) the generation, transmission, distribution and supply of

electricity are conducted on commercial principles;

(c) the factors which would encourage competition, efficiency,

economical use of the resources, good performance and

optimum investments;

(d) safeguarding of consumer’s interest and at the same time,

recovery of the cost of electricity in a reasonable manner;

(e) the principles rewarding efficiency in performance;

(f) multi year tariff principles;

(g) that the tariff progressively reflects the cost of supply of

electricity and also reduces cross-subsidies in the manner

specified by the Appropriate Commission;

(h) the promotion of co-generation and generation of electricity

from renewable sources of energy;

(i) the National Electricity Policy and tariff policy:

Provided that the terms and conditions for determination of

tariff under the Electricity (Supply) Act, 1948, the Electricity

Regulatory Commission Act, 1998 and the enactments

specified in the Schedule as they stood immediately before the

appointed date, shall continue to apply for a period of one year

or until the terms and conditions for tariff are specified under

this section, whichever is earlier.”

Section 61 provides that the appropriate commission shall, subject to the

provisions of the Act, specify the terms and conditions for the determination of

tariff. In doing so, it has to be guided by the considerations which are stipulated in

clauses (a) to (i). Among them, in clause (i) is the national electricity policy and

tariff policy.

23 Section 181 empowers the state commissions to make regulations

consistent with the Act and the rules to carry out the provisions of the Act. Among

the matters for which the regulations may provide are “the terms and conditions for

the determination of tariff under Section 61”6. In specifying the terms and

conditions for the determination of tariff, the appropriate commission (as Section

61 provides) “shall be guided” by the factors which are set out in clauses (a) to (i).

The expression “shall be guided” comprises of two elements: the ‘shall’ and, the

‘guidance’. Clauses (a) to (i) provide guidance to the commission in specifying the

terms and conditions for the determination of tariff. The expression “shall” indicates

that the factors which are specified in clauses (a) to (i) have to be borne in mind

by the appropriate commission. As guiding factors, they provide considerations

which are material to the determination of tariffs by the appropriate commission.

24 The national tariff policy has multi-faceted objectives. Significant among

them is the need to ensure to consumers the availability of electricity at reasonable

and competitive rates. The policy also seeks to ensure the financial viability of the

sector and underlines the need to attract investments. A financially sustainable

electricity sector is an important facet of the overall regulatory framework. The

6 Section 181 (2)(zd)

objectives of the policy emphasise the need to promote transparency, consistency

and predictability in regulatory approaches across jurisdictions. The policy

emphasises the need to minimise perceptions of regulatory risk. Finally, the policy

recognises the need to promote competition, efficiency in operations and

improvements in the quality of supply. In designing and formulating the regulatory

framework for tariffs, the delegate of the legislature has to bring about a balance

between the competing goals which the tariff policy incorporates.

25 As part of the process, the delegate has to bear in mind the interests of

diverse stake holders including consumers and producers. The process of framing

tariffs is of equal significance, for it is through the procedural framework that norms

of consistency, transparency and predictability can be enforced. Competition,

efficiency and quality of supply are key components of the policy framework in

designing tariffs. Clause 5.3(f) of the tariff policy speaks of the need to evolve

performance norms which incorporate incentives and disincentives and provide an

appropriate arrangement that fosters the sharing of gains of efficiency in

operations with consumers. Operating parameters in tariffs are required to be

pegged only on a “normative level” and not at the “lower of normative and actuals”,

save and except in those cases referred to in paragraph 5.3(h)(2). Paragraph

5.3(h)(2) deals with those cases where operations have been much below the

norm for several previous years. In those cases, the initial starting point in

determining the revenue requirement and the trajectories are fixed at a relaxed

level and not at desired levels. Under clause 5.3(f), the operating norms must fulfil

several parameters. They must be (i) efficient; (ii) relatable to past performance;

(iii) capable of achievement; and must progressively reflect increased efficiencies.

They may also take into consideration latest technological advances, fuel, vintage

of equipment, nature of operations, level of service to be provided to consumers,

among other factors. Continuous and proven inefficiency has to be controlled and

penalised. The operating norms must be designed to promote efficiency and to

ensure that the gains which accrue on account of efficient operations are shared

with the consumers of electricity. The operating norms will, therefore, have due

regard to the performance in the past as well as capacities for future achievement.

These must be dovetailed with all relevant considerations, bearing on the

requirements of the policy.

26 The Tariff policy provides guidance to the appropriate commission when it

frames regulations. The power to frame regulations is legislative in nature. It is

conferred upon the appropriate commission. The commission weighs numerous

factors. Its discretion in carrying out a complex exercise cannot be constrained.

The delegate of the legislature is therefore under a mandate to bring about a fair

and equitable balance between competing considerations. Standing at the

forefront of those considerations is above all the need to ensure efficiency and to

protect the interests of consumers. The submission which has been urged on

behalf of the appellant would reduce tariff fixation to a rather simplistic process of

bringing about equality between generating units which have the same design and

manufacturing origin. Such an approach overlooks the complex factors which

have to be borne in mind in the determination of tariffs. The submission which has

been urged on behalf of the appellant is based on the hypothesis that the CPRI

report underlined the similarity of Parli Unit 6, Paras Unit 3, Tata Trombay Unit 8

and the DTPS unit of the appellant. At the highest, the CPRI study would indicate

a similarity of specifications but not a similarity of performance. Performance, as

we have seen, is a critical element in designing an appropriate SHR. The SHR has

an important co-relationship with efficiency. The CPRI report indicates a detailed

analysis of RInfra’s DTPS. Specifically, in the context of DTPS, it observed:

“vii. Combining all the margins provided by the OEM, R-Infra

has been able to load the unit to 268 MW against the design

value of 250 MW. Maintaining this load is not harming the life

of the unit as the DTPS has ensured that all parameters are

kept within OEM limits. High loadability is made possible by

high energy efficiency or low unit heart rate of the unit. When

the deviation of the unit heat rate from the design heart rate is

low, heat generation in the equipment is low which enables the

parameters not to exceed their limits. As many as 66 units in

India have clocked an average annual plant loading in excess

of 100% UMCR in 2007-08.”

The CPRI report similarly contained an analysis of Units 5 and 6 of TPC-G and of

MSPGCL units. CPRI conducted studies on Units 1 and 2 of R Infra’s DTPS. In

its counter affidavit, MERC has tabulated the SHR achieved by DTPS for financial

years 2006-07 to 2009-10 as follows:

“Table No: 2 SHR achieved by DTPS from FY 2006-07 to FY 2009-10

Year Station Heat Rate (SHR) (kcal /kWh)

RInfra’s Submission in MERC Approved DTPS

Petition Achieved

It has been explained that to anticipate the SHR for financial year 2011-12 till

financial year 2015-16, the actual heat rate achieved during the previous years and

predicted deviation due to factors such as reduction in boiler efficiency due to coal

energy degradation and average annual aging loss were considered. The

anticipated SHR for DTPS for financial years 2011-12 to 2015-16 was computed

in the following manner:

“SHR = 2292* + (Reduction in Boiler Efficiency + Coal Quality

Degradation + Annual Ageing Loss) = 2350 kCal/kWh.

(* Station Heat Rate of 2292 kCal/kWh was taken from CPRI

Test Reports of March, 2010.)”

On a similar basis, CPRI carried out technical studies for Units 5 and 6 of TPC-G.

The SHR achieved by TPC-G Unit 5 (coal fired) from 2006-07 and 2008-09 was

computed. On this basis, the SHR, projected as an achievable heat rate, was

computed and an approved trajectory for Unit 5 for financial years 2011-12 to 2015-

16 was laid down. Similarly, in respect of Unit 6 of TPC-G, CPRI studies indicated

the SHR achieved for financial years 2006-07 to 2009-10. CPRI projected a heat

rate on the basis of fuel oil firing and fuel gas firing. On the basis of the CPRI report,

MERC arrived at its findings for TPC-G Units 5 and 6. In this regard, it has been

demonstrated in the counter affidavit that there was no discrimination in the

methodology followed and the same principle was uniformly applied.

27 The attention of the Court has also been drawn to the fact that the Tariff

Regulations 2011 contained a stipulation in clause 14 for the sharing of gains or

losses on account of controllable factors. Clause 14 provides as follows:

“14 Mechanism for sharing of gains or losses on account of

controllable factors:

14.1 The approved aggregate gain to the Generating Company

or Transmission License or Distribution License on account of

controllable factors shall be dealt with in the following manner:

(a) One-third of the amount of such gain shall be passed on as

a rebate in tariff over such period as may be stipulated in the

Order of the Commission under Regulation 11.6;

(b) The balance amount, which will amount to two-third of such

gain, may be utilised at the discretion of the Generating

Company or Transmission License or Distribution License.”

[The expression ‘controllable factors’ is explained in clause 12.2 of the regulations.]

28 Under the Tariff Regulations 2011, the approved aggregate gain to the

generating company was to be shared: one-third was required to be passed on as

a rebate in tariff while the balance of two-thirds would be utilised at the discretion

of the generating company. On the other hand, in the Tariff Regulations 2015,

Regulation 11 contains a corresponding mechanism for the sharing of gains on

account of controllable factors. Regulation 11 is in the following terms:

“11 Mechanism for sharing of gains or losses on account of

controllable factors:

11.1 The approved aggregate gain to the Generating Company

or Licensee or MSLDC on account of controllable factors shall

be dealt with in the following manner:

(a) Two-third of the amount of such gain shall be passed on as

a rebate in Tariff over such period as may be stipulated in the

Order of the Commission under Regulation 8.4;

(b) The balance amount of such gain shall be retained by the

Generating Company or Licensee or MSLDC.”

While in the Regulations of 2011, one-third of the aggregate gain was to be passed

on in the form of a rebate in tariff and the balance two-thirds was to be utilised by

the generating company at its discretion, in the 2015 regulations, the proportion

has been reversed. In the 2015 regulations, two-thirds of the amount of the gain

is required to be passed on as a rebate in tariff while the balance shall be retained

by the generating company. The interests of the consumer are required to be borne

in mind under the terms of the tariff policy consistent with Section 61. In its expert

judgment, the Commission, while formulating the 2015 regulations mandated that

an enhanced ratio of the aggregate gain would be passed on in the form of a rebate

on the tariff. This could have legitimately been borne in mind as a relevant

consideration in evaluating what should be appropriately fixed as the SHR for the

period in question.

29 The substratum of the case of the appellant is founded on a plea of

discrimination. Simply put, the plea is founded on the hypothesis that the CPRI

report regarded the units of DTPS as identical to Parli Unit 6 and Paras Unit 3 (of

MSPGCL) and Trombay Unit 8 (of TPC-G). The observations contained in the

CPRI report must be read in their entirety. The fact that the manufacturing

specifications of the units may be similar (assuming they are so) is only one aspect

of the total range of considerations which are required to be borne in mind under

the terms of the tariff policy. The tariff policy requires that the operating norms

should be efficient, relatable to past performance, capable of achievement and

progressively reflect increased efficiencies. They may also take into consideration

technical advancements, fuel, vintage of equipment, nature of operations and the

level of service among other factors. Mr Chidambaram laid emphasis on clause

5.3(f) of the tariff policy where it prescribes that the operating parameters and tariffs

should be at “normative levels” only and not at the “lower of normative and actuals”

except in the case of those units governed by para 5.3(h)(2). This submission will

not, however, carry the case of the appellant any further. Normative levels are

those which are fixed by the application of the standards guided by the terms of

the tariff policy while actual levels are those which have been achieved as a matter

of fact, in the past. The emphasis in the tariff policy is on creating incentives for

achieving higher efficiency in order to enable the ultimate consumer to have the

benefit of efficient operations.

30 Tariff fixation is a complex exercise involving a careful balance between

numerous considerations. The “shall be guided” prescription under Section 61

requires the appropriate commission to bear those considerations in mind.

Deducing past performance on the basis of historical data, balancing diverse policy

objectives and evaluating the comparative weight to be ascribed to the interests of

stakeholders is a scientific exercise which is carried out by the commission. The

nature of judicial review that is exercisable in a given subject area depends in a

significant measure on the nature of the area and the body which is entrusted with

the task of framing subordinate legislation. In Transmission Corporation of

Andhra Pradesh Ltd. v Sai Renewable Power Pvt. Ltd.,7 a two judge Bench of

this Court held thus:

“17. Fixation of tariff is, primarily, a function to be performed by

the statutory authority in furtherance to the provisions of the

relevant laws. We have already noticed that fixation of tariff is

a statutory function as specified under the provisions of the

Reform Act, 1998, Electricity Regulatory Commissions Act,

1998 and the Electricity Act, 2003. These functions are

required to be performed by the expert bodies to whom the job

is assigned under the law… The functions assigned to the

Regulatory Commission are wide enough to specifically

impose an obligation on the Regulatory Commission to

determine the tariff. The specialized performance of functions

that are assigned to Regulatory Commission can hardly be

assumed by any other authority and particularly, the Courts in

exercise of their judicial discretion. The Tribunal constituted

under the provisions of the Electricity Act, 2003, again being a

specialized body, is expected to examine such issues, but this

Court in exercise of its powers under Article 136 of the

Constitution would not sit as an appellate authority over the

formation of opinion and determination of tariff by the

specialized bodies.

18. …This Court has consistently taken the view that it would

not be proper for the Court to examine the fixation of tariff rates

or its revision as these matters are policy matters outside the

purview of judicial intervention. The only explanation for judicial

intervention in tariff fixation/revision is where the person

aggrieved can show that the tariff fixation was illegal, arbitrary

or ultra vires the Act. It would be termed as illegal if statutorily

prescribed procedure is not followed or it is so perverse and

arbitrary that it hurts the judicial ‘conscience’ of the Court

making it necessary for the Court to intervene. Even in these

cases the scope of jurisdiction is a very limited one.”

MERC is an expert body which is entrusted with the duty and function to frame

regulations, including the terms and conditions for the determination of tariff. The

Court, while exercising its power of judicial review, can step in where a case of

manifest unreasonableness or arbitrariness is made out. Similarly, where the

delegate of the legislature has failed to follow statutory procedures or to take into

account factors which it is mandated by the statute to consider or has founded its

determination of tariffs on extraneous considerations, the Court in the exercise of

its power of judicial review will ensure that the statute is not breached. However,

it is no part of the function of the Court to substitute its own determination for a

determination which was made by an expert body after due consideration of

material circumstances. In Association of Industrial Electricity Users v State of

Andhra Pradesh,8 a three judge Bench of this Court dealt with the fixation of tariffs

and held thus:

“11. We also agree with the High Court that the judicial review

in a matter with regard to fixation of tariff has not to be as that

of an Appellate Authority in exercise of its jurisdiction under

Article 226 of the Constitution. All that the High Court has to be

satisfied with is that the Commission has followed the proper

procedure and unless it can be demonstrated that its decision

is on the face of it arbitrary or illegal or contrary to the Act, the

court will not interfere. Fixing a tariff and providing for cross-

subsidy is essentially a matter of policy and normally a court

would refrain from interfering with a policy decision unless the

power exercised is arbitrary or ex facie bad in law.”

31 We commenced our discussion by emphasising, in our prefatory

observations, that the power to frame regulations is of a legislative nature. The

CPRI report was an input before the MERC in carrying out that exercise. MERC

followed the statutory procedures laid down for the determination of tariffs. It took

into account factors which it is mandated by the statute to consider. The national

tariff policy, suggestions of stakeholders as well as the assessment carried out by

the CPRI were duly considered. Hence, the present case does not fall in the

paradigm of manifest unreasonableness or arbitrariness to warrant the

interference of this Court. It would be rather formulaic for the Court to accept that

merely because DTPS was placed at par in the immediately previous period (2006-

07) and the period immediately succeeding (2016-20), that this must necessarily

be extrapolated to the intervening period governed by the MYT Regulations 2011.

A body which is entrusted with the task of framing subordinate legislation has a

range of options including policy options. If on an appraisal of all the guiding

principles, it has chosen a particular line of logic or rationale, this Court ought not

to interfere.

32 For the reasons which we have recorded in this judgment, we have come to

the conclusion that regulation 44.2(d) of the MERC (Multi Year Tariff) Regulations,

2011 does not suffer from any constitutional or statutory infirmity. We have,

however, furnished reasons of our own for affirming the ultimate decision of the

High Court to dismiss the writ petition. We have disapproved of the view of the

High Court that the writ petition under Article 226 was not maintainable and

accordingly set aside the direction on the imposition of costs. However, we hold

that there is no infirmity in the impugned regulation and accordingly affirm the

ultimate conclusion of the High Court to dismiss the writ petition under Article 226.

The Civil Appeal is, accordingly, disposed of. There shall be no order as to costs.

[Dr Dhananjaya Y Chandrachud]

[Hemant Gupta]

New Delhi; January 21, 2019